skip to Main Content
Phone: (613) 727-5111 – Email: info@gwal.com
City of Ottawa Archives Facility (100 Tallwood Drive)

Project Description

Three (3) storey, 91,000 ft.2 City of Ottawa archives facility including two (2) large (12,000 ft.2) and one (1) small (3,000 ft.2) standard temperature vaults (20°C @ 45% RH), one (1) low temperature vault (3,000 ft.2) (8°C @ 25% RH), archives preservations library and processing facility, 2,000 ft.2 mixed use office processing and library public archives facility, loading dock and lunch room:

  • Building has achieved LEED Gold with energy features as follows:
    – Condensing boilers and hot water tanks;
    – Hybrid heat pumps;
    – Domestic water preheat heat exchanges;
    – Chiller heat rejection heat reclaim to heat pump loop;
    – Dedicated make-up air unit with exhaust energy recovery wheel;
    – Individual room CO2 demand control ventilation;
    – Power monitoring and utilities metering for building consumption verification.

Project Details

Owner: City of Ottawa
Project Location: 100 Tallwood Drive, Ottawa, ON
Construction Completion: 2011
Building Type: Commercial and Industrial
Project Type: New Construction
Construction Value: $5.7 (M&E)

Back To Top
Close search
Search